Face Nailing Siding

What are face nails.
Face nailing siding. Loosen the tight nail or cut it with a hacksaw. Up off the siding. I have been reading all the dialogue about face nailing hardi plank siding etc. Face nailing exposes the fastener head to the elements and allows for the fastener to penetrate through two sheets of overlapped.
Renail the siding keeping the new nail in the center of the nailing slot and leaving it about 1 16 in. Blind nailing is preferable to face nailing since any nail heads are hidden by the next row of siding. Lift the siding up and look for nails that have been hammered in too tightly. That overlap is very important when it comes to nailing techniques.
My house 9 yrs old just experienced hurricane harvey and two of the gables lost a lot of siding. The only downside of pneumatic tools is that sometimes the installer will get going a little bit too quickly and will lose track of where the nails are going. These butt joints should be staggered to avoid noticeable patterns which is determined by the placement of the first course. Face nailing blind nailing measurments face nailing nailing through the overlap at the bottom of the plank for walls longer than 12 ft it is necessary to butt joint additional lengths of hardieplank siding.
Siding nail face nailing face nailing is applicable where dictated by building code in high wind areas and when fastening is to osb or equivalent sheathing without penetrating into studs. Loose siding can leave your home unprotected from weather and insects. In face nailing a nail is driven through the face of the board driving down through two overlapping layers into the substrate below. Hardieplank is fastened to the home by either blind nailing or face nailing.
The nails are covered by the board overlap in the blind nailing method while the nails are left exposed on the exterior of the boards in the face nailing method. Center joints over studs unless special metal off stud joiners are. Nails do not need to be predrilled except near the ends. Siding is installed with slight overlap between boards a bit like the way shingles are installed.
Next nail the first row of siding into the studs leaving 1 8 gaps at the corner boards to allow for caulking.